Data
Products.
Data access services.
Tools.
Product information.
Operational news.
Operational News
Operational news about Ssalto and Duacs processing system.
2013-06-13 update of processing chain planned on June 25
We are pleased to announce an update of the processing chain which calculates the model-based atmospheric corrections, associated with a vertical resolution increase of the ECMWF model.
2013-05-13 The server avisoftp.cnes.fr is momentarily unavailable
The server avisoftp.cnes.fr is momentarily unavailable.
2013-04-12 [Jason-2] Jason-2 back to operational mode
Jason-2 is back to operational mode since April 5th.
2013-04-08 [Jason-2] Restart of core mission
Friday 5th April, the POSEIDON3 altimeter, the AMR radiometer and precise GPS have been switched on; allowing the mission to restart nominally.
2013-04-05 [Jason-2] Restart expected by Friday April 5th
All the recovery operations are going smoothly and without any trouble. On 5th April, Jason-2 will be back in nominal mode and the core payload switch on will be performed.
2013-04-03 [Jason-2] Recovery in progress
The recovery procedure has been optimized and the current schedule foresee to turn on the Jason-2 payload core science instruments (POSEIDON3, AMR, GPSP) on Friday, 5 April.
2013-04-02 [Jason-2] new Safe Hold Mode
Few hours after the recovery, the Jason-2 spacecraft entered again in safe mode on 30 March 2013.
2013-03-29 [Jason-2] Restart of core mission
On 2013/03/29, the POSEIDON3 altimeter has been switched on.
2013-03-28 [Jason-2] Jason-2 status update - start of recovery
The Jason-2 spacecraft entered safe mode on 25 March 2013 at approximately 03:30:59z. The current schedule foresee to turn on the Jason-2 payload core science instruments (POSEIDON3, AMR, GPSP) on Saturday, 30 March.


